
JAYPEE GREENS KASA BLANCA
Jaypee Greens presents Kasablanca towers; limited edition super luxury high-rise apartments located amidst the 18 hole golf course and would be just next to 'Boomerang - The club'.
Every apartment here is set to be a much coveted address. Part of a planned development, it promises you a refreshing environment which will keep rejuvenating you for years to come.
- »Vaastu Compliant
- »Private Terrace/ Garden
- »Security / Fire Alarm
- »Servant Quarters
- »RO Water
- »Intercom Facility
- »System Piped Gas
- »Air Conditioned
- »24 Hrs. Water
- »24x7 Power Backup
- »Wi-fi Connectivity
- »DTH Television Facility
- »Reticulated gas supply
- »ATM
- »Reserved Parking
- »Gymnasium
- »Swimming Pool
- »Shopping Complex
- »Lift
- »Service/Goods Lift
- »Sports complex
- »Kid’s Play Area
- »Tennis Court
- »Badminton Court
- »Health Club
- »Visitor Parking
- »Cafeteria/Food Court
- »Golf Course
- »Basket ball Court
- »Landscape Garden
- »Senior Citizen park
- »Club House
- »Amphitheatre
- »Kids Water Park
- »Meditation Court
- »Banqueting
- »Party lawns
- »Music & Dance room
- »Beauty Parlour
- »Multi Cuisine Restaurant
- »Jogging Track
- »Security System
- »Multipurpose Room
- »Bar/Lounge
- »Laundry Service
- »Waste Disposal
- »Maintenance Staff
The Indian Realtors
Address:FF 53, Ansal Fortune Arcade,
Sector -18, Noida
Mob:+91-9999088884
Email:info@theindianrealtors.com
PAYMENT PLAN OF KASA BLANCA
A.Construction Linked Plan (G+33 floors)
|
S.No |
Payment Due |
Percentage (%) of BSP |
Other Charges |
|
1. |
On Booking along with application form |
As Applicable* |
|
|
2. |
On or within 1 month from the date of issuance of PAL |
20% of BSP (less Booking Amount*) |
|
|
3. |
On or within 3 month from the date of issuance of PAL |
10% of BSP |
|
|
4. |
On commencement of excavation |
10% of BSP |
Car Parking** |
|
5. |
On laying of podium slab |
10% of BSP |
|
|
6. |
On laying of 4th floor roof slab |
10% of BSP |
IDC |
|
7. |
On laying of 9th floor roof slab |
5% of BSP |
|
|
8. |
On laying of 14th floor roof slab |
5% of BSP |
EDC |
|
9. |
On laying of 19th floor roof slab |
5% of BSP |
|
|
10. |
On laying of 24th floor roof slab |
5% of BSP |
ESSC |
|
11. |
On laying of 29th floor roof slab |
5% of BSP |
|
|
12. |
On laying of top floor roof slab |
5% of BSP |
|
|
13. |
On completion of internal plaster & flooring within the apartment |
5% of BSP |
|
|
14. |
Upon offer of Possession |
5% of BSP |
Maintenance advance + IFMD + One time lease rent charges |
|
Total |
100% |
||
**Additional car parking, if any, shall also be payable on commencement of excavation
Notes:
1. Installments under S. No. 4 - 13 may run concurrently with those under S. No. 1 - 3 based on the physical progress of Work at site.
2. The demand letter for Installments at S. No. 4 to 13 shall be sent in advance providing for payment period of up to 15 days. B. Down Payment Plan
B. Down Payment Plan
|
S. No |
Payment Due |
Percentage (%) of BSP |
Other Charges |
|
1. |
On Booking along with application form |
As Applicable* |
|
|
2. |
On or within 1 month from the date of issuance of PAL |
95% of BSP (less Booking Amount*) |
IDC + EDC+ Car parking** + Electric substation charges |
|
3. |
Upon offer of possession |
5% of BSP |
IFMD + Maintenance advance+ One time Lease Rent charges |
|
Total |
100% |
|
|
Note: Down payment discount shall be upto 15% of BSP or lower based on the stage of construction at the time of issuance of PAL
** Additional car parking shall also payable on or within one month from the date of issuance of PAL.
C. Partial Down Payment Plan
|
S. No |
Payment Due |
Percentage (%) of BSP |
Other Charges |
|
1. |
On Booking along with application form |
As Applicable* |
|
|
2. |
On or within 1 month from the date of issuance of PAL |
55% of BSP (less Booking Amount*) |
IDC + EDC+ Car parking** + Electric substation charges |
|
3. |
On laying of podium slab |
20% of BSP |
|
|
4. |
On laying of 6th floor roof slab |
20% of BSP |
|
|
5. |
Upon offer of possession |
5% of BSP |
IFMD + Maintenance advance + One Time Lease Rent charges |
|
Total |
100% |
|
|
Note: Partial Down payment discount shall be up to 11% of BSP or lower based on the stage of construction at the time of issuance of PAL
** Additional car parking shall also payable on or within one month from the date of issuance of PAL
*Booking Amount
|
Unit Type |
Booking Amount |
|
4bhk |
16 Lacs |
PRICE LIST OF JAYPEE GREENS KASA BLANCA
Tower G+33
|
Particulars |
Launch Price |
|
1st - 3rd Floor |
Rs. 8950/- psf |
|
4th - 6th Floor |
Rs. 8995/- psf |
|
7th - 9th Floor |
Rs. 9040/- psf |
|
10th - 12th Floor |
Rs. 9085/- psf |
|
14th - 16th Floor |
Rs. 9130/- psf |
|
17th - 19th Floor |
Rs. 9175/- psf |
|
20th - 22nd Floor |
Rs. 9130/- psf |
|
23rd - 25th Floor |
Rs. 9085/- psf |
|
26th - 34th Floor |
Rs. 9000/- psf |
(Additional Service Tax as applicable)
Possession :45 months (with a grace period of 6 months)
|
Structure |
RCC frame structure with RCC sheer walls |
|
Floors |
|
|
Living/Dining/Foyer |
Italian / Imported Marble / Imported Designer Tiles or equivalent |
|
Bedrooms/Study |
Teak Wood / Hard Wood or equivalent |
|
Workers Room |
Ceramic tiles / Vitrified tiles |
|
Lift Lobby |
Selection of natural stones/High quality tile as per design |
|
Walls |
|
|
External |
Combination of Stone/ Texture Paint |
|
Internal |
Acrylic Emulsion/ Texture Paint |
|
Ceiling |
|
|
Ceilings |
POP with cornice / coves as per requirements 10 foot ceilings throughout main level |
|
Doors/ Windows |
|
|
Internal |
Main Door- Teak Wood Solid Doors; Rest Panelled Solid Wood |
|
External |
Powder coated / anodized aluminum frames with toughened glass for areas having balconies in front of windows. For exterior face laminated glass up to 3ft. from finished floor level and toughened glass panel above. Mosquito mesh shutters on openable windows |
|
Bathrooms |
· Floors - High quality ceramic/ vitrified designer tiles or equivalent · Walls - Stone / high quality tiles or equivalent as per design in all Areas · Ceiling - POP / False ceiling as per design · Premium fixtures and fittings. Jacuzzi in Master bathroom |
|
Kitchen |
· Floors - Marble / high quality Designer tile or equivalent · Walls - 2’ high dado in decorative tiles above counter, Balance walls Painted in Plastic emulsion paint · Granite Counter with back splash of designer tiles, SS chimney, SS sink with double drainboard · Ceiling - POP / False ceiling as per design |
|
Woodwork |
Wardrobes in all bedrooms as per design(high gloss finish) / PU coated / veneered / laminated |
|
Ventilation |
VRF technology ACs in all bedrooms and in Living/ Dining Area |
|
Balconies |
|
|
Floors |
External Grade Deck floor/ Vitrified tiles |
|
Railings |
Glass with SS/ Wooden handrail |
|
Ceiling |
Plastic Emulsion paint |
|
Workers Room |
|
|
External Doors and Windows |
Aluminum & mosquito mesh shutters |
|
Walls |
Plastic Emulsion paint |
|
Internal Doors |
Wood frame with door shutter as per design |
|
Ceiling |
Plastic Emulsion paint |
|
Lift Lobbies / Corridors |
|
|
Walls |
Marble/ High quality designer tile |
|
Ceiling |
POP/ False ceiling as per design |
|
Utilities and Facilities |
|
|
Fixture & Fitting |
Designer Modular Kitchen , Double Door Refrigerator Hob, Chimney, Microwave Oven, Fully automatic Washing Machine, RO System |
|
Lifts |
High standard lift as per latest design |
|
Security |
· CCTV surveillance in lift lobbies & basement for security and control · Video door phones for security at the entrance of each apartment |
|
Landscaping |
Landscaped common areas to preserve and enhance the natural characteristics of Site |
|
Water supply |
Water supply through underground supply lines/ overhead tanks |
|
Sewage water |
Soiled water drainage into main sewer outside property |
|
Storm drainage |
Storm water drainage system integrated with rainwater harvesting |
|
Fire protection |
Fire detection/ sprinkler system as per fire safety norms |
|
Main Electrical Supply |
Electrical wiring in concealed conduits with modular switches and power back-up |
|
Telephone/ Data |
· Telephone cable pre-wired into all rooms · Central VSAT or IP TV connection for each apartment · Cabling for internet access as per design |
|
Services |
Maintenance for common area on chargeable basis |
|
Gas |
Provision of piped gas supply |











